
Testing Services:
Supply, setup and Installation of:
Pumping Equipment
Generator Hire (if required)
Level & Flow Monitoring
GSM Based logging system. |
Step 3: We insert an electronic
measuring probe into the well and place an electronic flow metre on the outlet which gives an accurate flow rate reading in real time to the user.
Step 4: We fit a flow regulating
valve on the line and run discharge piping to a nearby disposal location.
Types of Tests:
- Flow Step tests
- 72hr Pump run tests.
- 7 day Pump run tests.
More if required……….
After the Test:
- Full report and recommendations for your development.
- Option to purchase hired pump if required.
- Full design and quotation for proposed development.
|

|